Priority Stabilisation & Fabric Protection Works, The Clock Tower

Project:

Priority Stabilisation & Fabric Protection Works, The Clock Tower, TU Dublin, Grangegorman, Dublin 7

Client:

Grangegorman Development Agency

Value:

€1m

Project Status:

Complete

BMP Role:

On this project, we provided full Quantity Surveying Services

Architect:

Fitzgerald Kavanagh & Partners (FKP Architects)

Description

The objective of the project is to safeguard the Clock Tower building from further deterioration. The works will include re-roofing, repair/replacement of structural timbers, protection of vaulted ceiling and lath and plaster ceilings generally, essential repairs to walls and window surrounds including raking out and re-pointing and plastering in lime render.

The building is a three-storey, seventeen bay structure, built circa 1814 and designed as a penitentiary by Francis Johnston. It is one of the oldest surviving buildings on the Grangegorman Campus. It was extensively remodelled circa 1864 by Edward Carson. The surviving building is part of a much larger complex of buildings much of which was demolished in the latter part of the 20th Century. It is a good example of a public institutional building of its time.

BMP are delighted to be part of a very experienced conservation and restoration team headed by FKP Architects.

See More Projects Like This

Welcome to Brendan Merry & Partners, where construction meets craftsmanship. With a legacy built on precision and passion, we specialise in transforming visions into enduring structures.

  • Residential

  • Third Level Education

  • General Hospitals

  • Primary Education

  • Art & Culture/ Local Authority

See More Projects Like This

Welcome to Brendan Merry & Partners, where construction meets craftsmanship. With a legacy built on precision and passion, we specialise in transforming visions into enduring structures.

  • General Hospitals

  • Primary Education

  • Art & Culture/ Local Authority

SHARE THIS PROJECT